
Arrays + envelope
Roof + Solar Visual Documentation
Overview and detail imagery of roofs and solar arrays, organized for qualified client teams. The commercial still on this page is a warehouse roof and lot — array-specific stills are scoped per site. Not an engineering report and not a condition certification.
01
Brief
We collect the mission goal, the site, and the window from you first. A listing still, a month-over-month jobsite set, a claim file, a roof packet, and an orthomosaic are five different flights. Where and when matter as much as what.
02
Authorize
Airspace class, LAANC on the live UAS Facility Map, Part 107 Waivers, TFR and National Security Event notices, and local permits (NYPD for New York City operations, property/GC access, venue clearance). Coordination happens here — not on the pad.
03
Conditions
Day-of weather, TFRs, National Security Events, and NOTAMs can change an approval that looked clean the night before. This is the GO / NO-GO gate. Authorization is planning status, not a launch.
04
Fly
Capture from the viewpoints the brief and the authorization actually allow — stills, film, or a mapping grid. The aircraft comes down when the coverage for the deliverable is in the card, not when the battery is empty.
05
Process
After the flight: cull, color, align, and reconstruct. Photogrammetry, 3D site models, construction tracking sets, and inspection packets are built here. A map is not a JPEG of a map — it is processed data.
06
Deliver
Stills, film, orthomosaics, DEMs, 3D models, progress comparisons, and reports — organized to the specification in the brief. This is the product the client files, presents, or sells. Flying is only half the job.
Planned around the operating need
Useful visual context, with clear boundaries.
Overview and detail imagery of roofs and solar arrays, organized for qualified client teams. The commercial still on this page is a warehouse roof and lot — array-specific stills are scoped per site. Not an engineering report and not a condition certification.
Built for Solar installers, roofers, and property teams. Every assignment begins with the decision the media needs to support, the site, access, requested timing, and intended output.
A submitted brief starts a feasibility review. It does not authorize a flight, confirm a date, or create a contract. Conditions and approvals can change what is operationally possible.
Typical deliverables
- Array / roof overview
- Panel-level stills
- Context of access and surroundings
Other paths
All capabilities →Altitude Changes Everything
From Rooftops to Bottom Lines.
Tell us the site and the decision the media has to support. We will scope the flight, the deliverables, and whether it is operationally feasible under Part 107.
Plan a Drone Mission



