
Jobsite documentation
Construction Progress
Repeatable viewpoints so month-over-month progress, staging, and site context are comparable — not a new angle every visit. The sample packet is NJDOT’s North Munn Avenue Bridge over I-280 and the adjacent Crossings at Brick Church Station.
01
Brief
We collect the mission goal, the site, and the window from you first. A listing still, a month-over-month jobsite set, a claim file, a roof packet, and an orthomosaic are five different flights. Where and when matter as much as what.
02
Authorize
Airspace class, LAANC on the live UAS Facility Map, Part 107 Waivers, TFR and National Security Event notices, and local permits (NYPD for New York City operations, property/GC access, venue clearance). Coordination happens here — not on the pad.
03
Conditions
Day-of weather, TFRs, National Security Events, and NOTAMs can change an approval that looked clean the night before. This is the GO / NO-GO gate. Authorization is planning status, not a launch.
04
Fly
Capture from the viewpoints the brief and the authorization actually allow — stills, film, or a mapping grid. The aircraft comes down when the coverage for the deliverable is in the card, not when the battery is empty.
05
Process
After the flight: cull, color, align, and reconstruct. Photogrammetry, 3D site models, construction tracking sets, and inspection packets are built here. A map is not a JPEG of a map — it is processed data.
06
Deliver
Stills, film, orthomosaics, DEMs, 3D models, progress comparisons, and reports — organized to the specification in the brief. This is the product the client files, presents, or sells. Flying is only half the job.
Planned around the operating need
Useful visual context, with clear boundaries.
Repeatable viewpoints so month-over-month progress, staging, and site context are comparable — not a new angle every visit. The sample packet is NJDOT’s North Munn Avenue Bridge over I-280 and the adjacent Crossings at Brick Church Station.
Built for Owners, GCs, lenders, and project managers. Every assignment begins with the decision the media needs to support, the site, access, requested timing, and intended output.
A submitted brief starts a feasibility review. It does not authorize a flight, confirm a date, or create a contract. Conditions and approvals can change what is operationally possible.
Typical deliverables
- Scheduled progress stills
- Site-wide context
- Shareable stakeholder set
- Optional orthomosaic
- 3D site model on request
- Aerial + ground field film
Construction Tracking
I-280 overhead. Brick Church below it.
Repeatable viewpoints of NJDOT’s North Munn Avenue Bridge replacement over I-280, then ground hyperlapse of The Crossings at Brick Church Station — Embark apartments at the train station and the new ShopRite. Process and Deliver are where the comparison set is built. The bridge project runs through spring 2028.
Selected sample
North Munn Avenue Bridge Over I-280
NJDOT’s $20.3 million, federally funded replacement of the North Munn Avenue Bridge decks and superstructure over Interstate 280 in East Orange. Steel in the span, orange barrier, dump trucks on the deck, live traffic in the lanes below. The Freeway Drive work zone meets North Munn Avenue — the same dirt the hyperlapse was shot from. Construction is scheduled through spring 2028.

Construction
North Munn Avenue Bridge Over I-280
NJDOT’s $20.3 million, federally funded replacement of the North Munn Avenue Bridge decks and superstructure over Interstate 280 in East Orange. Steel in the span, orange barrier, dump trucks on the deck, live traffic in the lanes below. The Freeway Drive work zone meets North Munn Avenue — the same dirt the hyperlapse was shot from. Construction is scheduled through spring 2028.
Open the case study →Other paths
All capabilities →Altitude Changes Everything
From Rooftops to Bottom Lines.
Tell us the site and the decision the media has to support. We will scope the flight, the deliverables, and whether it is operationally feasible under Part 107.
Plan a Drone Mission



